China Horizontal Electric Steam Boilers
Description:
Electric heating boiler mainly consist of boiler body and the electronic control box and control system components
Product Features:
1, Automatic intelligent control technology, no special duty. Flexible operation, can be set to manual or automatic mode.
2, The electric heating tube is the core component of the electric heating boiler, which directly determines the boiler service life. Selecting non-metallic electric heating pipe (such as ceramic electric heating pipe), for it's load resistance, long life, and the hydropower separation structure, the boiler never leakage.
3, No noise, no pollution, high thermal efficiency, the boiler body is made of high quality and high efficient insulation material, small heat loss, energy saving.
4, Boiler packaging using well-known color plate package design, elegant appearance, not easy to rust.
Specification:
Rated evaporation capacity kg/h |
200 |
500 |
1000 |
2000 |
Rated working pressure MPa |
0.7 |
0.7 |
0.7 |
1.0 |
Rated steam temperature ºC |
170 |
170 |
170 |
184 |
Water-supply temperature ºC |
20 |
20 |
20 |
20 |
Design Efficiency % |
98 |
98 |
98 |
98 |
Input motor power Kw |
1.1 |
1.1 |
1.1 |
1.1 |
The voltage of heating tube V |
380 |
380 |
380 |
380 |
Reactance tube single power Kw |
12 |
12 |
18 |
18 |
FAQ:
Q: Are you manufacturer?
A: Yes, we are a manufacturer. Our factory established in 1978 in Pingdu Qingdao.
Q: How to choose a boiler type?
A: Generally we should confirm the boiler type (steam or hot water), capacity, pressure(or output temperature) and fuel(coal, biomass, gas or oil) of the boiler.
Q: How long is the warranty time for the boilers?
A: Based on highly responsible for your esteemed company, our company provides one year free maintenance if due to equipment itself failure.
Q: How about the installation?
A: We could offer you 2 proposals.
I)Guide installation
Our company arranges 1-2 staffs to guide the installation of boiler on site, fully guarantee the installation quality.
II)Staff installation
Our company is in charge of installation process, only your company to provide accommodation, round-trip cost and the wages of workers.
Q: Could you offer some wear parts?
A: Our company provides a set of tools for free, such as wrenches, gaskets used for convenient maintenance.
Q: What's your MOQ?
A: 1 set, if purchase more, you will get a fairly favorable price.
Q: Do you have any Certificate?
A: Yes. We have got ISO9001 & ISO14001 certificates. If necessary, we could help you to get CE, ASME or AS certificate.
Q: What is your payment term?
A: T/T, L/C is very well accepted.